Solar PV Installation for a Historic Church in Stirling

Writer: matt825052
matt825052
May 19
1 min read

Updated: Sep 17


We recently worked on a 40kW solar PV installation at a church and community hall in the Stirling area.

The project involved 81 panels and came with some additional planning considerations because parts of the property are listed. This meant the installation had to be carefully planned around the building and the relevant Historic Environment Scotland requirements.

Hill View Renewables worked as part of the wider project team to help deliver the installation safely and neatly, while respecting the character of the site.

A great example of a larger solar PV system on a community building where careful planning was just as important as the installation itself.


 
 
 

Comments


Job-3-37.jpg

Ready to make the switch?

Join hundreds of Scottish homeowners transitioning to cleaner, lower-cost energy. Start saving from the day your system goes live.

Find us here

Location

Unit 71

Cultybraggan

Comrie 

PH6 2AB

Hours

Mon-Fri 9:00 am – 5:00 pm

 

Hill View Renewables is a fully registered TrustMark Registered Business and a certified member of the Renewable Energy Consumer Code (RECC). All our microgeneration installations are certified under the Microgeneration Certification Scheme (MCS). We strictly adhere to the TrustMark Code of Conduct, the TrustMark Customer Charter, and the RECC Consumer Code. Any deposits taken or workmanship warranties issued are fully protected by an Insurance Backed Guarantee (IBG).

bottom of page