top of page

Community Solar Installation In Maybole

Writer: matt825052
matt825052
May 19
1 min read

Updated: Sep 17

We recently completed a solar PV installation for a community centre in Maybole.

The system was designed around the building’s energy use and available roof space, with the aim of helping reduce electricity costs and make better use of renewable energy.

The installation was planned and carried out with minimal disruption to the centre, followed by full testing and commissioning.

It’s a good example of how solar PV can work well for community buildings as well as homes and commercial properties.






 
 
 

Comments


Job-3-37.jpg

Ready to make the switch?

Join hundreds of Scottish homeowners transitioning to cleaner, lower-cost energy. Start saving from the day your system goes live.

Find us here

Location

Unit 71

Cultybraggan

Comrie 

PH6 2AB

Hours

Mon-Fri 9:00 am – 5:00 pm

 

Hill View Renewables is a fully registered TrustMark Registered Business and a certified member of the Renewable Energy Consumer Code (RECC). All our microgeneration installations are certified under the Microgeneration Certification Scheme (MCS). We strictly adhere to the TrustMark Code of Conduct, the TrustMark Customer Charter, and the RECC Consumer Code. Any deposits taken or workmanship warranties issued are fully protected by an Insurance Backed Guarantee (IBG).

bottom of page